Tony Bazzinotti, Preston Scroggin, Aldo Addario, Rich Larrabee
Absent: Adda Manosalvas Concrete Project Apartment decks, go
with pedestrian coating as recommended by Engineer. Catwalks:
delete 32,500 l.f. of non structural cracks on catwalks. Painter will handle
this. Engineer say’s this should
be more economical than having cement people repair them.
Replace only balusters, cap railings, and posts that have structural
deterioration. Cement Project Specs
do not include repairing sheer walls. This
is supposed to be done when building is painted.
We will check with Bell Painting to be sure this is part of their job. Three contractors were
selected to be interview for concrete restoration.
Aqua-Shield Corp, Daniello & Lime of Florida LLC, CSC Colwell Building.
Engineer will be notified and he will set up meeting.
One more contractor may be selected if
recommended by engineer. Parking Issues: Parking issues were
discussed. 1. Many unit owners seem to be having more than one car.
These extra cars are taking Guest Parking spots.
This will present two serious problems in the future. Board will have to
take firm action at
some point. A more serious problem
is owners or guests of owners taking the parking spaces of other owners.
Board will give 2 warnings, if it persists, cars will be towed at car
owners expense. Board feels there
is sufficient parking spots available without using another owners spot. Maintenance: Maintenance man has
begun painting scratched or peeling apartment doors. It looks very good
and has made many owners happy. Maintenance
man must insure uniform color and type. Maintenance man has
also complained that too many unit owners are giving him jobs to do or notifying
him of problems. This is contrary
to good practice or efficiency. We must remind unit
owners to notify Doris of any problems on things that need attention or
recommendations for service or improvements.
We will have maintenance man check with Doris every morning to get this
list and tend to it. Naturally some
things will have to be prioritized. Signs are going to be
posted by the elevator stating for all service and contractors to use the west
elevator. Make sure pads are in
place when needed. Another sign
will be made to tell contractors to use the open door/close door switch when
loading materials incoming or outgoing materials, not to force the doors open
with materials.
Next meeting scheduled for Monday, Feb. 4, 2001 at 7 PM.
Preston made motion to adjourn, seconded by Rick. Minutes taken from
Tony’s notes. Doris Schmidt Office Manager |